MAJOR PROJECTS

This division encompasses VINCI Construction Grands Projets, Dodin Campenon Bernard, VINCI Construction Terrassement’s major-projects arm and Spiecapag. Its order book remained very high, representing more than two and a half years of business activity.
This momentum was driven by major transport infrastructure projects, in many cases carried out in synergy with other VINCI Construction entities, and by water works including large projects relating to climate resilience and renewable energy production.

 

  • 12,224  employees
  • €3.3 bn (up 28 %) in revenue

Grand Paris Express

_ In France, the VINCI Construction teams on the largest urban mobility infrastructure programme in Europe completed the civil engineering works package on Line 15 South (8km of tunnels and five stations) between Issy-les-Moulineaux and Villejuif, continued to build the Noisy-Champs station on the same line, and worked on the underground and overhead sections of Line 18 (11.8km of tunnels, 13 ancillary structures, 6.7km of viaducts and three stations along the overhead section).